Share Share
US National Dams
Wellington Nap C-23 Dam
Find a dam
Contents
Explore
Search
US National Dams
More
About US National Dams
Copyright © 2021 nationaldams.com and US National Dams. All Rights Reserved.

All content on this website ("the Site") is the property of US National Dams. The collection and assembly of content on this Site are the exclusive property of US National Dams and are protected by copyright and other intellectual property laws.

Was this site helpful to you? We would very much appreciate you whitelisting us or using this link when you shop on Amazon (no impact on your order).
Was this site helpful to you? We would very much appreciate you whitelisting us or using this link when you shop on Amazon (no impact on your order).

Wellington Nap C-23 Dam Share Share

Overview Share Share
Back to Top
Camden, Missouri
Local government owned
Built in 1970

Wellington Nap C-23 Dam is an earth dam built on the TR Missouri River and is located in Camden, Missouri. It was built in 1970 .

The dam is owned by the local government. It is also known as Well-Nap C-23.

Location
Wellington Nap C-23 Dam
Camden, Missouri, U.S.
Dam type
Earth
Dam type
Other
Purpose
Unknown
Foundation type
Unknown
Core type
Was this site helpful to you? We would very much appreciate you whitelisting us or using this link when you shop on Amazon (no impact on your order).
Map Share Share
Back to Top
Was this site helpful to you? We would very much appreciate you whitelisting us or using this link when you shop on Amazon (no impact on your order).
Was this site helpful to you? We would very much appreciate you whitelisting us or using this link when you shop on Amazon (no impact on your order).
Ownership Share Share
Back to Top
Lafayette Soil & Water
Owner
Local government

Wellington Nap C-23 Dam is owned by the local government.

Was this site helpful to you? We would very much appreciate you whitelisting us or using this link when you shop on Amazon (no impact on your order).
Construction Share Share
Back to Top
1970
Completed
USDA NRCS
Dam designer
TR Missouri River
River built on
Wellington Nap C-23 Dam was built in 1970.
Was this site helpful to you? We would very much appreciate you whitelisting us or using this link when you shop on Amazon (no impact on your order).
Was this site helpful to you? We would very much appreciate you whitelisting us or using this link when you shop on Amazon (no impact on your order).
Metrics Share Share
Back to Top
Summary
Dam length 500 feet
Dam height 47 feet
Structural height 47 feet
Max discharge 327 cubic feet per second
Max storage 200 acre feet
Normal storage 148 acre feet
Surface area 12 acres
Drainage area 146 square miles
500 feet
Dam length

Length of the dam is defined as the length along the top of the dam. This also includes the spillway, powerplant, navigation lock, fish pass, etc., where these form part of the length of the dam. If detached from the dam, these structures should not be included.

47 feet
Dam height

Height of the dam is defined as the vertical distance between the lowest point on the crest of the dam and the lowest point in the original streambed.

47 feet
Structural height

Structural height of the dam is defined as the vertical distance from the lowest point of the excavated foundation to the top of the dam. Top of dam refers to the parapet wall and not the crest.

327 cubic feet per second
Max discharge

Number of cubic feet per second the spillway is capable of discharging when the reservoir is at its maximum designed water surface elevation.

200 acre feet
Max storage

Maximum storage is defined as the total storage space in a reservoir below the maximum attainable water surface elevation, including any surcharge storage.

148 acre feet
Normal storage

Normal storage is defined as the total storage space in a reservoir below the normal retention level, including dead and inactive storage and excluding any flood control or surcharge storage. For normally dry flood control dams, the normal storage will be a zero value.

12 acres
Surface area

Surface area, in acres, of the impoundment at its normal retention level.

146 square miles
Drainage area

Drainage area of the dam, in square miles, which is defined as the area that drains to a particular point (in this case, the dam) on a river or stream.

Was this site helpful to you? We would very much appreciate you whitelisting us or using this link when you shop on Amazon (no impact on your order).
Safety Share Share
Back to Top
High
Downstream potential hazard

Dams assigned the high hazard potential classification are those where failure or mis-operation will probably cause loss of human life.

Has emergency action plan
Emergency action plan

An emergency action plan is defined as a plan of action to be taken to reduce the potential for property damage and loss of life in an area affected by a dam failure or large flood.

7/19/2016
Most recent inspection date

Inspections are every 5 years.

Was this site helpful to you? We would very much appreciate you whitelisting us or using this link when you shop on Amazon (no impact on your order).
Was this site helpful to you? We would very much appreciate you whitelisting us or using this link when you shop on Amazon (no impact on your order).
About Share Share
Also known as Well-Nap C-23
Former name 0
Latitude 39
Longitude -94
NID ID (National ID) MO10283
Was this site helpful to you? We would very much appreciate you whitelisting us or using this link when you shop on Amazon (no impact on your order).
Was this site helpful to you? We would very much appreciate you whitelisting us or using this link when you shop on Amazon (no impact on your order).
Was this site helpful to you? We would very much appreciate you whitelisting us or using this link when you shop on Amazon (no impact on your order).
Was this site helpful to you? We would very much appreciate you whitelisting us or using this link when you shop on Amazon (no impact on your order).
Was this site helpful to you? We would very much appreciate you whitelisting us or using this link when you shop on Amazon (no impact on your order).